
Ariane 5 G+G+
Manufacturer: ArianeGroup · Maiden flight: 2 March 2004 · Wikipedia (opens in new tab)
Launches3
Successes3
Failures0
Success rate100.0%
The Ariane 5 G+ had an improved EPS second stage, with a GTO capacity of 7,100 kg (15,700 lb) for a single payload or 6,300 kg (13,900 lb) for two. It flew three times in 2004, with no failures.
Upcoming launches
No upcoming launches